Pre-Competition Week
Electrical system verification:
- Charge all batteries fully 24 hours before event
- Load test batteries — verify voltage stays above 12.0V under simulated competition load
- Clean all power connections — wire brush on terminals, re-torque, apply dielectric grease
- Check alternator output — should maintain 13.8V+ at idle under load
Mechanical inspection:
- Check all mounting hardware — every screw, bolt, washer tight
- Verify enclosure integrity — no air leaks (use incense smoke test)
- Test for panel resonances — press on panels during playback, listen for rattles
- Inspect wire routing — no chafing, no stress on connections
Audio system verification:
- Back up DSP settings — export configuration files, email to yourself
- Verify speaker polarity — all drivers moving in correct direction
- Measure system response — REW measurement for reference
- Test at competition power level — confirm no thermal protection, no distortion